The work covered under the City of Evans 11th Avenue Water Line Replacement Project will
consist of the 11th Avenue Water Line Replacement – Phase II and the State Farm Water Line
Connection which includes the following:
11th Avenue Water Line Replacement – Phase II
• installation of approximately 2,600 linear feet of new 12-inch PVC water line;
• 120 linear feet of 8-inch PVC water line and
• 26 linear feet of 6-inch PVC water line,
• abandonment of existing water line and valves,
• connections to existing water lines, services and hydrant leads and
• surface restoration of asphalt and concrete.
State Farm Water Line Installation
• installation of approximately 353 linear feet of new 8-inch PVC water line;
• connections to existing water lines and
• surface restoration.